PSI - Issue 64

Eun-Rim Baek et al. / Procedia Structural Integrity 64 (2024) 1117–1124 Author name / Structural Integrity Procedia 00 (2019) 000–000

1120

4

Fig. 1. Details of the infilled RC frame specimens (adapted from Baek et al., 2022).

Fig. 2. Retrofitting RC frames using (a) B-TRM; and (b) TCP panels. (c) Example of a finished TCP. (d) Capillary tubes and carbon fibre sheet embedded in a TCP. (adapted from Baek et al., 2022).

Made with FlippingBook Digital Proposal Maker