PSI - Issue 37

M. Ajmal et al. / Procedia Structural Integrity 37 (2022) 964–976 Author name / Structural Integrity Procedia 00 (2019) 000 – 000

973

10

Fig.10: (a) Linear fitting of data points during loading and unloading having maximum correlation coefficient. CTOD-Load after 150K cycles. (b) CTODp from the data in (a).

Fig.11: (a) Linear fitting of data points during loading and unloading having maximum correlation coefficient. CTOD-Load after 160K cycles. (b) CTODp from the data in (a).

Figure 12: CTOD versus Load at 100, 215, 330 and 445µm behind crack tip (after 160K cycles)

Made with FlippingBook Ebook Creator