PSI - Issue 37

M. Ajmal et al. / Procedia Structural Integrity 37 (2022) 964–976 Author name / Structural Integrity Procedia 00 (2019) 000 – 000

972

9

Fig.7: (a) Loading and unloading curves of CTOD vs Load. (b) CTODp vs Load.

Fig.8: (a) Linear fitting of data points during loading and unloading having maximum correlation coefficient. CTOD-Load after 70K cycles. (b) CTODp from the data in (a).

Fig.9: (a) Linear fitting of data points during loading and unloading having maximum correlation coefficient. CTOD-Load after 90K cycles. (b) CTODp from the data in (a).

Made with FlippingBook Ebook Creator