PSI - Issue 84

M. Viviani et al. / Procedia Structural Integrity 84 (2026) 931–936

934

Fig. 3 – Broken strands

From a design perspective, the connection using stranded cables was also constructed using this material, with anchor heads on the bridge deck and a removable section in the viaduct abutment (Fig.4).

Fig. 4 – Provisional cables

Made with FlippingBook flipbook maker