PSI - Issue 58

Yazmin Sahol Hamid et al. / Procedia Structural Integrity 58 (2024) 130–136 Yazmin Sahol Hamid et al. / Structural Integrity Procedia 00 (2019) 000–000

136

7

Gapar, M.A., Razali, M.F., Mansor, H., Hamid, Y.S., Subki, N.E.A., 2021. Industrial Building System (IBS): A Unique Intra-Module Connection on Modular Steel Building (MSB). IOP Conf Ser Mater Sci Eng 1200, 12014. Jeremy Bates, Simon Hope, Justin Marking, Sophie Chick, Paul Tostevin, 2020. Impacts: Tipping Points. Savills. Lacey, A.W., Chen, W., Hao, H., Bi, K., 2018. Structural response of modular buildings – An overview. Journal of Building Engineering 16, 45– 56. Liu, X.C., Pu, S.H., Zhang, A.L., Xu, A.X., Ni, Z., Sun, Y., Ma, L., 2015. Static and seismic experiment for bolted-welded joint in modularized prefabricated steel structure. Journal of Constructional Steel Research 115, 417–433. Liu, X.C., Pu, S.H., Zhang, A.L., Zhan, X.X., 2017. Performance analysis and design of bolted connections in modularized prefabricated steel structures. Journal of Constructional Steel Research 133, 360–373. Morandi, P., Albanesi, L., Damiani, N., Manzini, C.F., Magenes, G., 2022. In-plane seismic performance of an innovative steel modular reinforcement system for URM walls. Procedia Structural Integrity 44, 1060–1067. Palmiotta, A., Garbellini, S., Audisio, L., Sulla, R., D’Amato, M., Gigliotti, R., 2022. Seismic behaviour of steel modular buildings: numerical analysis and comparisons between different design solutions. Procedia Structural Integrity 44, 1156–1163. Wang, W., Fang, C., Qin, X., Chen, Y., Li, L., 2016. Performance of practical beam-to-SHS column connections against progressive collapse. Engineering Structures 106, 332–347. Yang, B., Tan, K.H., 2013. Experimental tests of different types of bolted steel beam–column joints under a central-column-removal scenario. Engineering Structures 54, 112–130.

Made with FlippingBook - Online catalogs