PSI - Issue 52

Rakesh Katam et al. / Procedia Structural Integrity 52 (2024) 72–88 Rakesh Katam/ Structural Integrity Procedia 00 (2019) 000 – 000

85

14

transfer the loads to the ground, placement of shear connectors on the main member, and completion of the concreting are started.

Fig. 11. Re-strengthening (a) Bottom plate; (b) Sections placement; (c) Section along the wall; (d) Shear connectors; (e) Scaffolding; (f) Concreting.

Made with FlippingBook Annual report maker