PSI - Issue 44
Giuseppe Iiritano et al. / Procedia Structural Integrity 44 (2023) 641–648 Giuseppe Iiritano et al./ Structural Integrity Procedia 00 (2022) 000–000
645
5
• search for the progressive kilometer at the beginning of the bridge / viaduct, rounded up or down, using the "Street View" display mode;
Fig. 3b. Example of geolocation of the bridge present at km 5 + 900 of the SP 1 - Province of Cosenza.
• identification of the progressive kilometer at the beginning of the bridge/viaduct using the "Measure distance" tool;
Fig. 3c. Example of geolocation of the bridge present at km 5 + 900 of the SP 1 - Province of Cosenza.
• identification of the work by means of the "Street View" display mode;
Fig. 3d. Example of geolocation of the bridge present at km 5 + 900 of the SP 1 - Province of Cosenza.
Made with FlippingBook flipbook maker