PSI - Issue 2_A
18 8
M N James et al. / Procedia Structural Integrity 2 (2016) 011–025 Author name / Structural Integrity Procedia 00 (2016) 000–000
Figure 7. Induction heat treatment of the pipe after completion of the WeldCore® process.
200
100
0
-100
-200
Stress (MPa) -300
x = 37 mm; Hoop stress x = 27 mm; Hoop stress x = 18 mm; Hoop stress
-400
-500
Circumferential Distance from Hole Centreline (mm) 0 10 20 30 40 50 60 70
Figure 8a. Residual hoop stresses in the as-welded FTHP specimen 1A.
Made with FlippingBook. PDF to flipbook with ease