M N James et al. / Procedia Structural Integrity 2 (2016) 011–025 Author name / Structural Integrity Procedia 00 (2016) 000–000

17 7

Figure 5. Sequence of events that occur in the WeldCore® process using a bespoke FTHP processing platform.

Figure 6. FTHP processing platform in-situ on a section of thick walled steam pipe. The pads are for preheating the pipe to approximately 200ºC prior to commencing the WeldCore® process.