PSI - Issue 78

Michele Morici et al. / Procedia Structural Integrity 78 (2026) 1673–1680

1679

a)

b)

Figure 6. Seismic accelerations recorded on March 4, 2025, by the (a) FLPC.HNN and the (b) CMRN.HNN stations.

a)

b)

Figure 7. Comparison between the seismic signal recorded at the IT-CMRN-HNN station and the signal recorded by the A1 accelerometer installed in the ChIP building (Level 0, above the isolation system) in the (a) X direction and (b) Y direction.

b)

a)

Figure 8. Comparison between the seismic signal recorded at the IT-CMRN-HNN station and the signal recorded by the A2 accelerometer installed in the ChIP building (Level 2, roof) in the (a) X direction and (b) Y direction.

Figure 9. Shear force time history recorded by the SGB1 sensor installed on one of the steel vertical braces of the ChIP building at Level 0, above the isolation system.

Made with FlippingBook Digital Proposal Maker