PSI - Issue 62

Giuseppe Iiritano et al. / Procedia Structural Integrity 62 (2024) 105–112 Giuseppe Iiritano et al./ Structural Integrity Procedia 00 (2019) 000 – 000

112

8

by the authorities, the Region proceeds to financing) and to review its role as planning body in a more rational perspective, aiming to know the state of risk of all bridges and viaducts so as to be able to allocate available funds to situations of greatest risk. The project probably represents the first large-scale application of the methodology introduced by the “Linee Guida” , applied so far exclusively on case studies or in any case on limited samples of bridges and viaducts, and is of fundamental importance: effective and efficient planning of the use of limited economic resources available for structural rehabilitation / seismic adaptation cannot in fact ignore the knowledge of the risk level of the existing works. References Ministero delle Infrastrutture e dei Trasporti, Consiglio Superiore dei Lavori Pubblici, 2020. Linee Guida per la Classificazione e Gestione del Rischio la Valutazione della Sicurezza ed il Monitoraggio dei Ponti esistenti. Salvatore W., 2020. Classificazione e Gestione del Rischio dei Ponti Esistenti Ministero delle Infrastrutture e della Mobilità Sostenibili, Consiglio Superiore dei Lavori Pubblici, 2021. Linee Guida per la Classificazione e Gestione del Rischio la Valutazione della Sicurezza ed il Monitoraggio dei Ponti esistenti.

Made with FlippingBook Ebook Creator