PSI - Issue 59
Valentin Aleksiievets et al. / Procedia Structural Integrity 59 (2024) 710–717 Valentin Aleksiievets et al. / Structural Integrity Procedia 00 (2019) 000 – 000
713
4
b
a
c
Fig. 2. Nail connections: (a) 1-4; (b) 7-9; (c) 10-12.
Testing of all connections was conducted under compression on the R-5 machine (EN 380: 2008, DSTU 3129: 2015) (Fig. 3).
Fig. 3. Nail connections under load.
Made with FlippingBook - Online Brochure Maker