PSI - Issue 64

3

Francisco Játiva et al. / Procedia Structural Integrity 64 (2024) 1468–1475 Jativa et al./ Structural Integrity Procedia 00 (2019) 000 – 000

1470

(a)

(b)

(c)

(d)

(e)

(f)

(g)

(h)

(i)

(k)

(j)

(l) Fig. 1. Recycled aggregate processing. (a, b) Gathering and transporting 180 tons of debris; (c) Main raw aggregate pile; (d-f) Varous types of debris (metal, plastic, wood, cement bags) (g) Conveyor belts; (h) Metallic rods trapped in the conveyor’s electromagnet; (i) Production of recycled Stone #57, Stone #7 and sand; (j-l) Recycled aggregtes samples used for this study.

Made with FlippingBook Digital Proposal Maker