PSI - Issue 64

Rubina Canesi et al. / Procedia Structural Integrity 64 (2024) 1712–1719 Author name / Structural Integrity Procedia 00 (2019) 000 – 000

1719

8

https://doi.org/10.1088/1755-1315/682/1/012047 Love, P. E. D., Ahiaga-Dagbui, D. D., & Irani, Z. (2016). Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation. Transportation Research Part A: Policy and Practice , 92 , 184 – 194. https://doi.org/10.1016/j.tra.2016.08.007 Namous, E. A., & Al Battah, M. (2021). Evaluating the Factors That Cause Cost and Time Overrun in the Residential Construction Projects in the UAE: Project Manager Perspective. ZEMCH International Conference , January , 370 – 382. Park, Y. I., & Papadopoulou, T. C. (2012). Causes of cost overruns in transport infrastructure projects in Asia: Their significance and relationship with project size. Built Environment Project and Asset Management , 2 (2), 195 – 216. https://doi.org/10.1108/20441241211280873 Pehlivan, S., & Öztemir, A. E. (2018). Integrated Risk of Progress-Based Costs and Schedule Delays in Construction Projects. Engineering Management Journal , 30 (2), 108 – 116. https://doi.org/10.1080/10429247.2018.1439636 Sami Ur Rehman, M., Shafiq, M. T., & Afzal, M. (2022). Impact of COVID-19 on project performance in the UAE construction industry. Journal of Engineering, Design and Technology , 20 (1), 245 – 266. https://doi.org/10.1108/JEDT-12-2020-0481 Sierra, F. (2022). COVID-19: main challenges during construction stage. Engineering, Construction and Architectural Management , 29 (4), 1817 – 1834. https://doi.org/10.1108/ECAM-09-2020-0719 Subramani, T. (2014). Causes of Cost Overrun In Construction. IOSR Journal of Engineering , 4 (6), 01 – 07. https://doi.org/10.9790/3021-04640107

Made with FlippingBook Digital Proposal Maker