PSI - Issue 64
Mingyang Xi et al. / Procedia Structural Integrity 64 (2024) 515–522
521
7
Author name / Structural Integrity Procedia 00 (2019) 000 – 000
(a) Initial Value Collection
(b) Tensioning
(c) Jumper Protection
Fig. 9. Self-sensing Strand On-Site Construction
Table 4. Self-sensing Strand Monitoring Data Table
Monitoring data
Number
Grouting 1538.66
Initial
Lock
Within 12h
Within 24h
/nm
1530.16
1538.69
1538.66
1538.66
S-1
192.2
F /kN
0.0
192.9
192.2
192.1
/nm
1548.75
1540.13
1548.76
1548.75
1548.75
S-2
193.9
F /kN
0.0
194.2
194.0
194.0
/nm
1538.97
1530.26
1538.98
1538.97
1538.97
S-3
194.0
F /kN
0.0
194.2
193.9
194.0
/nm
1538.79
1530.08
1538.81
1538.80
1538.79
S-4
186.1
F /kN
0.0
186.6
186.4
186.1
S-5
Not under construction
(a) Initial Value Collection
(b) Force Monitoring Data Fig. 10. Self-sensing Strand Monitoring Data Chart
Made with FlippingBook Digital Proposal Maker