PSI - Issue 32
105 5
A. Kostina et al. / Procedia Structural Integrity 32 (2021) 101–108 A. Kostina/ Structural Integrity Procedia 00 (2021) 000 – 000
(a)
(b)
Fig. 3. Distribution of von Mises stress (Pa) in sand at 4 th day after shutdown of freezing wells (a) soil was frozen up to the contour of the shaft; (b) soil was frozen up to the project thickness.
(a)
(b)
Fig. 4. Distribution of xx in silt at 4
th day after shutdown of freezing wells (a) soil was frozen up to the contour of the shaft; (b) soil was frozen up
to the project thickness.
(a)
(b)
Fig. 5. Distribution of xx in sand at 4 frozen up to the project thickness.
th day after shutdown of freezing wells in sand (a) soil was frozen up to the contour of the shaft; (b) soil was
Made with FlippingBook Online newsletter creator