Fig. 12 (b). Provisional situation after competition of all the structural works and reopening of the bridge to traffic

Fig. 12 (a). Launching of the new structural deck right before the first landing of the launching nose on the pier N.3 in the middle of the Tiber River

The next pictures show, instead, a comparison between a project simulation of how the renewed “Ponte di Ferro” would look like after the completion of works and the present situation, after the relaunching competition of the historical truss beams.

Fig. 13 (a). Project simulation of the aspect of the renewed “Ponte di Ferro” at the end of works

Fig. 13 (b). Present situation after the relaunching of the historical truss beams

10. Conclusions To save and at the same time preserve the historical value of the fire damaged Ponte di Ferro, an iconic and crucial link between the Ostiense and Portuense banks of the Tiber River that required, also, an important enhancement, a new “post-industrial” style bridge has been erected. Main figures involved and Project data Owner: “Roma Capitale” municipality Client: “ANAS SpA” Contractor: “RTI Ircop SpA - Cosar Srl - Romana Scavi Srl” Concept, Preliminary and Detailed Design: Prof. Eng. Mario Paolo Petrangeli and Eng. Andrea Polastri - Mario Petrangeli & Ass. S.r.l Jet grouting design: Eng. Luigi Albert - Soil Engineering SRL Responsible for the administrative process: Eng. Adriano Massimi - ANAS SpA Client’s Engineer: Eng. Giancarlo Linguetta - ANAS SpA Site Engineer: Eng Lorenzo Mudu - Ircop SpA Total cost of works: € 10.908.229,84 Estimated time of execution: 528 days Starting of works: July the 20th, 2023 Opening to traffic: March the 20th, 2025 Completion of restoration of the original deck: on going References EN 14399-10:2018. High-strength structural bolting assemblies for preloading – Part 10: System HRC – Bolt and nut assemblies with calibrated preload. CEN – European Committee for Standardization, Brussels. D.M. 17 dicembre 2020 n. 578. Linee guida per la classificazione e gestione del rischio, la valutazione della sicurezza ed il monitoraggio dei ponti esistenti. Ministero delle Infrastrutture e dei Trasporti, Roma. Subcontractor for steel works: “Maeg Costruzioni SpA” Subcontractor for jet grouting works: “Dolomiti Rocce Srl”