PSI - Issue 84
S. Lorefice et al. / Procedia Structural Integrity 84 (2026) 669 – 676
675
For the application of reinforced plaster on the extrados of arches and spandrels, the original fill (unit weight ≈ 24 kN/m³) must be completely removed and replaced with a lightweight stabilized mix (unit weight ≈ 18 kN/m³) to reduce stress levels and improve overall structural stability.
Fig.9. Model of the welded wire mesh
9 Results of Post-Operam Analyses – Existing Bridges Pushover analyses along the longitudinal and transverse directions were repeated under post-operam conditions, accounting for the strengthening interventions and the presence of the new steel structure. The interpretation of results follows the same considerations as for the ante-operam analyses.
a)
b)
Fig.10. Example of output data for (a) longitudinal e (b) transversal pushover – six-span bridge, post-operam
c)
d)
Fig.11. Example of output data for (c) longitudinal e (d) transversal pushover – three-span bridge, post-operam
10 Conclusions The seismic safety of the masonry approach structures was assessed through the calculation of the Risk Index (IR) , defined as the ratio of the seismic capacity of the structure to the seismic demand in terms of peak ground acceleration: ( ) = / Higher IR values indicate greater seismic safety
Made with FlippingBook flipbook maker