PSI - Issue 58
4
Aleksandar Grbovic et al. / Procedia Structural Integrity 58 (2024) 42–47 A. Grbovic et al. / Structural Integrity Procedia 00 (2019) 000–000
45
10000 12000 14000 16000 18000 20000
0 2000 4000 6000 8000
Lift minus weight (N)
1
1.5
2
2.5
3
3.5
4
4.5
5
5.5
Length along the span y (m)
Fig. 7. Load distribution (lift force minus inertial force) along the span.
30000
25000
20000
15000
Moment (Nm)
10000
5000
0
1
1.5
2
2.5
3
3.5
4
4.5
5
5.5
-5000
Length along the span y (m)
Fig. 8. Moment distribution (lift force minus inertial force) along the span.
Table 1. Calculated and measured (*) loads and moments at ribs. Rib No. y (m) Total force L-W (N) Moment (Nm) Force in rib (N)* Moment * (Nm)
1 2 3 4 5 6 7 8 9
4.54
706
92
300 772
96
4.206 3.872 3.535 3.200 2.865 2.543 2.217 1.891 1.566
1669 3474 5033 6728 8517
482
454
1340 2729 4651 7129
1492 1565 1608 1659 1686 1906 2180 2200
1310 2701 4623 7101
10312 12192 14125 15433
10053 13570 17664 22337
10025 13607 17900 22895
10
Made with FlippingBook - Online catalogs