PSI - Issue 34
Jørgen Svendby et al. / Procedia Structural Integrity 34 (2021) 51–58 J. Svendby et al. / Structural Integrity Procedia 00 (2019) 000–000
57 7
(a)
(b)
(c)
(d)
(e)
(f)
Fig. 4. SEM-images of (a) the commercial sample before corrosion test, (b) the AM-sample before the corrosion test, (c) and (e) the commercial sample after corrosion test, (d) and (f) AM-sample after the corrosion test.
1 rosion and protective phase formations are therefore needed to successfully implement AM as a BPP-manufacturing technique.
Acknowledgements
The works presented in this paper was performed under programme of and funded by the European Space Agency (ESA Contract No. 4000126860). The view expressed herein can in no way be taken to reflect the o ffi cial opinion of the European Space Agency.
Made with FlippingBook Ebook Creator