PSI - Issue 33
8
Marcos Sánchez et.al/ Structural Integrity Procedia 00 (2021) 000–000
Marcos Sánchez et al. / Procedia Structural Integrity 33 (2021) 97–106
104
Fig. 10. Stress-distance curves at critical load in SENB fracture specimens.
Fig. 11. Stress-distance curves in tubular beams obtained by applying a unit load (1N).
Table 4. TDC parameters obtained from calibration, together with the experimental and the estimated values of load-bearing capacity.
Tube PVC1 PVC2 PVC3
L (mm)
σ o (MPa)
LBC est (kN)
LBC exp (kN)
20.00
16.72
4.20 3.19
3.80 3.70
0.14
185
Made with FlippingBook Ebook Creator