M. Araújo et al. / Procedia Structural Integrity 22 (2019) 160–165 Maria Araújo/ Structural Integrity Procedia 00 (2019) 000 – 000

164

5

In table 1 and 2 it is possible check an example of the reports that must be followed and fulfilled by the responsible for the assembly, these reports are checked, approved and inserted by the quality responsible in an internal system available to all project involved persons.

Table 1. Reports that must be followed to have a good final result.

Approved and available in the system

Report

Project preparation reports

Yes Yes Yes Yes Yes Yes Yes Yes

Technicians documentation (trainings) Equipment documentation (inspection, maintenance) Components quality acceptance reports

Technical information and technical instructions

Technical quality reports

Final inspection reports (internal control) Final acceptance report (external control)

Table 2. Technical quality reports that must be fulfilled by the assembly responsible.

Approved and inserted in the system

Non conformities detected

Non conformities solved

Report

Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No

Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No

Construction site approval

Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes OK

Earth resistance measurement site approval

Material received approval

Construction journal - Daily status

Test reports - Grout samples

Gap measurements concrete segments Horizontal measurement concrete tower Vertical measurements concrete tower Prestressing tendons assembly list Final inspection concrete tower assembly

Prestressing tendons assembly list

Pos tensioning prestressing cables protocol

Test reports - Grout samples

Injection Protocol

Final Result

OK

OK

Like all other components, tubular steel towers, machine house, generator, rotor and blades are subject to strict