Mladen Lukić / Procedia Structural Integrity 19 (2019) 655–664
658
4
Author name / Structural Integrity Procedia 00 (2019) 000–000
In order to deal with these sub-tasks, a specific Working Group has been created within CEN: TC 250/SC 3/WG 9 as early as in 2014. From the contractual point of view, a five-member Project Team (SC3.T8) was created as a part of Phase 3 (July 2018 – June 2021) as specified by the Response to Mandate M/515 (2013). Note: SC 3 is TC 250 subcommittee dealing with all the parts of Eurocode 3 (steel structures). Table 1 contains two sub-tasks common for the revision of all Eurocodes, namely sub-tasks 1 and 2. The others are proper to EN 1993-1-9 (2005). It is also evident that some of the sub-tasks are considered with higher priority comparing to others: the tasks that have EC priority must be fulfilled. The others are wishful, but the Project Team in charge of drafting the new version of the standard cannot be held responsible if nothing has been included. The sub-tasks are detailed in the sub-chapters given below. 2.2.1. Sub-task 1: Reduction in number of National Choices (NDPs) The inclusion of NDPs in the published Eurocodes has exceeded what was originally expected. All tasks dealing with existing Eurocode parts include thus a requirement to work to reduce the number of NDPs and enable better consensus on values / choices adopted by countries. The differences of use among countries can be seen in Table 2.
Table 2. Analysis of NDPs within National Annexes on EN 1993-1-9 (2005)
Clause
AT BE BG CH CY DE DK ES FI FR GB HR IE IT LU NL NO PL PT SE SK
1.1(2) Note 1 1.1(2) Note 2 2(2) Note 2(4) Note 3(2) Note 2
?
3(7) Note 3(7) Note 3(7) Note
5(2) Note 2 6.1(1) Note 6.2(2) Note 7.1(3) Note 2 7.1(5) Note 8(4) Note 2
Annex A Annex B
Recommended choice adopted or no additional information/choice given Recommended choice adopted or no additional information/choice given, but with comment(s) Other choice than recommended or additional information/choice directly given Not mentioned Other choice than recommended or additional information/choice given with reference to another document
The Project Team is expected to develop proposals to reduce the number of NDPs and/or enable better consensus on values adopted by countries to be achieved. Those proposals should be included in deliverables (new drafts of the standard).