PSI - Issue 11
Nicola Croce et al. / Procedia Structural Integrity 11 (2018) 371–378 Croce N. et al/ Structural Integrity Procedia 00 (2018) 000 – 000
377
7
Fig. 18. Restoration of the external surface
Fig. 19. Preparatory works for execution of the continuous r.c. slab
Made with FlippingBook Annual report maker