Construction Method / Names of Completed Bridge
Efficiency ( Dimensionless )
Construction Process
Transition
Material
Time
○ △
Lowering Method
Overhanging Arch Erection Method with Truss
○
×
Arch Center Method
○
×
Balanced Cantilever Method
◎ △
Launching Erection Method
△ ◎
Span by Span Construction Method
◎
×
Single ‐ Operation Method with Floating Crane or Pontoon
◎
×
Fixed Timbering Erection Method
◎
×
Table 5 : Structural change list No. 2 for newly constructed bridges.
Triangular Coordinate System
Constructed Completed Retrofitted Retrofitting
More efficient because of the material efficiency Efficient because of the material efficiency More efficient because of the material efficiency
Efficient because of the material efficiency Efficient if being used as a diagonal system
Efficient because of the material efficiency Efficient at both time and material because of being
Suspension System (Spanning System)
Low efficiency
Diagonal System (Beam System)
Web System (Beam System)
Efficient
used as a cantilever
Efficient for Supporting exisiting spanning systems
Arch System (Spanning System)
Low efficiency
Efficient
Table 6 : Effectiveness in each structure system.