PSI - Issue 80
M. Bennebach et al. / Procedia Structural Integrity 80 (2026) 136–145 Author name / Structural Integrity Procedia 00 (2019) 000–000
141
6
Fig. 6. Identification and results of inspection areas
Several sets of strain gauges were placed in the selected locations, in accordance with the IIW recommendations with respect to hot spot stress derivation from measurements. Figure 7 shows examples of such strain gauges placement.
Fig. 7. Strain gauges placement
The instrumented equipment is then tested under cyclic pressure and monitored all along the tests. Figure 8 illustrates
Made with FlippingBook - Online catalogs