PSI - Issue 78

Marius Eteme Minkada et al. / Procedia Structural Integrity 78 (2026) 177–184

182

a

b

Element

L0 L1 L2 L3 L4 L5

Element

L0 L1 L2 L3 L4 L5

o • •

• •

o

Column

Column

o

o

Roof element

Roof element

Sealant

Sealant

Vertical panel

Vertical panel

Horizontal panel

Horizontal panel

• o o •

• o o • o • o •

Masonry infill

Masonry infill

Windows

Windows

o • o •

Drywall partition

Drywall partition

Internal door

Internal door

o • o • o • o •

o o •

Storage racks

Storage racks

Overhead crane

Overhead crane

o •

Hydraulic elevator Electric elevator

Hydraulic elevator Electric elevator

o •

o •

o • o • o • o • o • o • o •

Refrigerator

Refrigerator

o • o • o • o • o • o •

Generator

Generator

Electrical panel

Electrical panel

Control centre

Control centre

Compressor

Compressor

Air handling unit

Air handling unit

Cooling towers

Cooling towers

Fig. 3. Seismic risk levels for Emilia (a) and L’Aquila (b) site. Note: the empty circles refer to the as -is condition, while the filled ones refer to the retrofitted condition.