Issue 75
M. Ramos et alii, Fracture and structural integrity, 75 (2026) 399-434 ; DOI: 10.3221/IGF-ESIS.75.29
M-06
M-07
M-08
M-09
M-10
CRACKS
W(mm) L (mm)
W (mm)
L (mm)
W (mm)
L (mm)
W (mm)
L (mm) 151.00
W (mm)
L (mm)
F-01 3.00 F-02 2.00
325.00
---
---
1.00 1.00 1.00
72.00 92.00
1.00
--- ---
--- ---
35.00
1.00 1.00
41.00
---
---
F-03 F-04 F-05
--- --- ---
--- --- ---
199.00
119.00
1.00
159.00
2.00 1.00
130.00
7 DAYS
--- --- ---
--- --- ---
--- --- ---
--- --- ---
--- --- ---
--- --- ---
70.00
--- ---
--- ---
F-06 1.00 F-01 3.00 F-02 3.00 F-03 1.00
60.00
339.00
1.00 1.00 1.00
65.00 49.00
2.00 1.00 1.00
80.00
2.00 1.00 1.00 1.00
161.00
1.00 2.00 2.00 1.00
46.00 35.00
42.00 11.00
100.00 127.00
25.00
209.00
165.00
138.00
F-04 F-05
--- ---
--- ---
--- --- --- --- ---
--- --- --- --- ---
--- --- --- --- ---
--- --- --- --- ---
11.00
79.00
14 DAYS
--- --- --- ---
--- --- --- ---
--- --- --- ---
--- --- --- ---
F-06 1.00 F-07 1.00 F-08 1.00 F-01 4.00 F-02 3.00 F-03 1.00 F-04 1.00 F-05 1.00 F-06 1.00 F-07 1.00 F-08 1.00 F-01 4.00 F-02 3.00 F-03 2.00 F-04 1.00 F-05 1.00 F-06 2.00 F-07 1.00 F-08 1.00 F-01 4.00 F-02 3.00 F-03 2.00 F-04 1.00 F-05 1.00 F-06 2.00 F-07 1.00 F-08 1.00
68.00 10.00 28.00 49.00 18.00 10.00 19.00 77.00 18.00 35.00 62.00 24.00 15.00 25.00 86.00 27.00 43.00 60.00 25.00 20.00 28.00 90.00 30.00 45.00 352.00 366.00 370.00
1.00 1.00 2.00 1.00
73.00 60.00
2.00 2.00 1.00
87.00
2.00 2.00 2.00 1.00
166.00
2.00 2.00 3.00 1.00
54.00 41.00
108.00 133.00
33.00
218.00
172.00
143.00
62.00
--- --- --- --- ---
--- --- --- --- ---
19.00
87.00
21 DAYS
--- --- --- ---
--- --- --- ---
--- --- --- ---
--- --- --- ---
--- --- --- ---
--- --- --- ---
1.00 1.00 2.00 1.00
80.00 86.00
2.00 2.00 2.00
99.00
3.00 2.00 2.00 2.00
174.00
2.00 2.00 3.00 1.00
61.00 50.00
115.00 141.00
41.00
227.00
180.00
152.00
71.00
--- --- --- --- ---
--- --- --- --- ---
24.00
94.00
28 DAYS
--- --- --- ---
--- --- --- ---
--- --- --- ---
--- --- --- ---
--- --- --- ---
--- --- --- ---
1.00 1.00 2.00 1.00
82.00 89.00
2.00 2.00 2.00
101.00 117.00 144.00
3.00 2.00 3.00 2.00
180.00
2.00 2.00 3.00 1.00
62.00 52.00
42.00
230.00
182.00
155.00
74.00
--- --- --- --- ---
--- --- --- --- ---
25.00
95.00
35 DAYS
--- --- --- ---
--- --- --- ---
--- --- --- ---
--- --- --- ---
--- --- --- ---
--- --- --- ---
Table 8: Collection of crack data in the samples of sample design 01 (DM-01), at 7, 14, 21, 28 and 35 days of concrete curing.
408
Made with FlippingBook - Online magazine maker