Elisa Spallarossa et al. / Procedia Structural Integrity 62 (2024) 241–249 Elisa Spallarossa, Giuseppe Pasqualato/ Structural Integrity Procedia 00 (2019) 000 – 000

244

4

• arrange, group, mediate and determine maximum and minimum values and make statistic calculations on both elements and defects as well as the deterioration level indicators of single elements, groups or the structure as a whole; • define the inspected condition of the structure using deterioration level values, assessing the context where the structure is located, the severity of the environment also based on the results of special tests on the materials and technical investigations if required; • define maintenance, repair and rehab work priorities in the short/medium term based on: indexes representing the condition of structural elements, statistical processing of index values and analysis of time series; • have available information useful for the analysis of the costs of works and their quantification.

Fig.1 Example of 2D representation of the pier cap element of the information collected during the inspection (text in italian)

5. BIM modelling for the creation of the Digital Twin as part of the inspection One of the next step implementation is the digital modelling use in the SIOS system.

a b Fig. 2. Example of the visual inspected deterioration transposition from the 2D pier cap development visual inspection file ; (b) to the pier cap BIM model (text in italian)

5.1. Integration between Project Management and Digital Information Management (BIM): definition of the WBS (Work Breakdown Structure) and database preparation The integration between BIM and Business Intelligence is based on the information management of the process, i.e. on the relationality between information from different databases, in this case from Bim models and the SIOS.