Issue 60

R. Karimihaghighi et alii, Frattura ed Integrità Strutturale, 60 (2022) 187-212; DOI: 10.3221/IGF-ESIS.60.14

Figure 5: Selecting evaluation pathway in software: 1) New Project, 2) Quick Analysis

Figure 6: Level 1 Assessment tab bar headings: Database, Project Info., Design and Location Info., Demotions, Inspection Info., Report.

 “Report” tab provides a list of input data with units, final results obtained from the FFS assessment calculations, and the suggestions. This report can be printed and/or saved by user. Also it is automatically stored in the SQL server database for future access.

196

Made with FlippingBook flipbook maker