PSI - Issue 54

5

Aikaterini Marinelli et al. / Procedia Structural Integrity 54 (2024) 332–339 Aikaterini Marinelli & Lukman Puthiyaveetil / Structural Integrity Procedia 00 (2019) 000 – 000

336

Fig. 2. Experimental set-up for two types of permeability tests

(a)

(b)

(d)

(e)

(c)

Fig. 3. Stages of specimen preparation for permeability testing: (a) de-molding; (b) cutting; (c-d) water- and pressurised air-cleaning; (e) freezing

(c)

(b)

(a)

Fig. 4. (a) Constant Head {CH} Permeability Test; (b) Falling Head {FH} Permeability Test; (c) Permeability results for M1, M2 and both methods (CH, FH)

Made with FlippingBook. PDF to flipbook with ease