Ramdane Bouzerara et al. / Procedia Structural Integrity 48 (2023) 4–11 Bouzerara et al/ Structural Integrity Procedia 00 (2023) 000 – 000
10
7
temperature measurement from the melting bag
Specific spi branching with Marchal plug
periodic electrical preventive on Marchal plug installation of a protective screen at the level of poured cast iron
7 10 0.7 34.3
7 10 0.05 3.5
Electricit y
Electrisat ion
Burn
Specific epi - LVR audit
taking of temperature
7 7 0.7 34.3
7 7 0.05 2.45
temperature measurement from the melting bag
heat
heat
Burn
emission
Specific epi - LVR audit
Wearing of the dust mask
7 4 0.4 11.2
7 4 0.05 1.4
Occupatio nal
dust
disease
inhalation
control of the crane for each handling operation check list designation of a single manoeuvre leader for the handling sound and light signals delimitation of the loading area
Specific epi - LVR audit - training on mechanical handling - CTS crane - CTS action plan Specific epi - LVR audit - training on mechanical handling - CTS crane - CTS action plan
loading the converter with cast iron and scrap
converter loading
7 7 0.4 19.6
7 7 0.05 2.45
trauma
cast iron pocket
load drop
meta l
scra p
buck et
steel pouring and slag evacuation
installation of a security barrier (Corp Guard)
pouring of steel and slag
7 7 0.4 19.6
7 7 0.05 2.45
melted metal grains
burning
projection of
melted metal
Practically, the risks have been mastered in different areas, Table 12. The same reasoning was done for the other areas, which led us to the following results in the table 13 and figure 14.
Table 12: Controlled risk report in different areas
Table 13: Level of residual risk in the 3 zones
area/number
Level of risk
number
percentage
risk control
risk not well controlled
uncontrolled risk
Risk control
1
5%
Refining
7
0 0 2
0 0 0
risk not well controlled
16
73% 23%
Casting machine
11
uncontrolled risk
5
Fluid
2
Figure 4: Final result of our evaluation