Y. Yanya, Frattura ed Integrità Strutturale, 46 (2018) 343-351; DOI: 10.3221/IGF-ESIS.46.31
To improve the mixing peaceability of recycled pervious concrete and ensure its strength, a small amount of coarse sand (natural river sand with fineness modulus of 3.3) was added (sand percentage: 10%) was added (Tab. 1). The design of mix proportion is shown in Tab. 2. Aperture size/mm 9.5 4.75 2.36 1.18 0.60 0.30 0.15 Type II grading region requirement/% 0 0-10 0-25 10-50 41 70 70 92 90 100 The first accumulative sieve residue percentage/% 0 0.5 11.8 41.9 65.2 80.4 92.6 The second accumulative sieve residue percentage/% 0 0.7 13.5 43.2 67.6 83.8 91.3 Table 1: Natural sand grain grading.
Material utilization amount per unit volume (kg/m 3 )
Replace ment rate/%
Sand percentag e/%
No.
Water involved in cement hydration
Added water
RA1
RA2
NA Natural sand 1378 153 1240 153 968 153
Cement
RC0 RC30 RC50 RC100
0
10 10 10 10 10
0
0 0 0 0
307 307 307 307 307
92 92 92 92 92
0 3
30 50
136 415
10 32 28
100 100
1378
0 0
153 153
RC100D
826
550
Table 2: Mix proportion of recycled pervious concrete Note: NA: natural aggregate (5~10 mm); RA1: recycled coarse aggregate (5~10 mm); RA2: recycled coarse aggregate (10~20 mm) The forming and maintenance of test specimens All the concrete was mixed using a 50 L blender. Firstly sand and cement were mixed evenly. Then coarse aggregate and water were added. After 3 ~ 5 min of mixing, the slump degree was measured, about 35 mm~50 mm. After testing of the slump degree, the concrete mixture was poured into a steel mould and tamped; the surface was smoothed. The mould was removed after 24 hours. Then it was maintained in a curing room (20±2 °C, humidity higher than 95%). After 28 days, all the test specimens were taken out for testing. T EST METHODS Porosity and permeability coefficient he effective porosity of test specimens was calculated based on the mass variation of test specimens after being immersed in water and dried by air for 24 h. The calculation formula is: where P stands for porosity (unit: %), m 1 stands for the mass of test specimens after 24 hours of air drying (unit: g), v stands for the volume of test specimens (unit: cm 3 ), and ρ w stands for the density of water at room temperature (unit: g/cm 3 ). Permeability coefficient Permeability coefficient was tested using constant water head method, and the test device is shown in Fig. 1. Pervious concrete was prepared using polyvinylchlorid pipe mould in a nominal outside diameter of 110 mm×150 mm. Then the test specimens were vertically fixed at the stent in the middle of overflow gutter. Valve for water supply was opened. After the volume of water flowing from the outflow ports of the overflow gutter and porous cylinder became stable, difference of the water levels of the porous cylinder and overflow gutter (H) was measured using a steel gauge. When the water levels were being stable for 30 s, a second chronograph was started; at the same time, water flowing from the water outlet was stands for the mass of test specimens in water (unit: g), m 2 T 2 m [1 ( 1 )] 100% w v m P (1)