Issue 42
H. Carvalho et alii, Frattura ed Integrità Strutturale, 42 (2017) 93-104; DOI: 10.3221/IGF-ESIS.42.11
NEWANCHORAGE EYE-BAR
4000 mm
ANCHORAGE EYE-BAR EXISTENT
Fiigure 16: New position of anchorage eye-bars in the massif set over the rock.
Figure 17: Numerical model and von Mises stress distribution at pylons bases [MPa].
Figure 18: Eye-bar support numerical model and von Mises stress distribution [MPa].
Figure 19: Eye-bar anchorage numerical model and von Mises stress distribution [MPa].
101
Made with FlippingBook Ebook Creator